LATEST WORKS

Work Samples

N

A project to design and implement a commercial administrative complex and warehouses on Al-Hawari Road, Benghazi

Design and implementation of an integrated commercial and administrative complex with stores and an administration building on an area of 5,000 square meters on the main road of the cement factory (Al-Hawari) with modern designs and optimal exploitation of the project’s space. The building consists of two floors with an area of 1,000 square meters on each floor. The ground floor contains shops. Commercial with its own bathrooms, and the first contains divisible administrative offices, in addition to warehouses with metal structures with an area of 1,400 square meters, and a separate administration building, with gardens, internal corridors, and a goods unloading yard, where all considerations were taken in terms of safety, monitoring, and protection systems.

N

Project to establish a paved road linking the Fourth Ring Road and the Fifth Ring Road, Shabna (D)

Design and implementation of a linking asphalt road with a length of 1,250 meters and a width of 7 metres, including surveying and making the necessary designs, taking into account infrastructure networks of water, sewage, electricity, and house connections, with full implementation including excavation, backfilling, leveling, and supply of foundation layers, compaction, asphalt materials from MCO materials, and concrete. Asphalt and traffic lights.

N

Construction project (676 housing units in the Jardinah area) Participation in the construction of housing units for Barqa Company

Implementation period: From (01/10/2020) until (01/07/2021) Executive status: Completed according to the schedule.

N

Maintenance and rehabilitation project for a damaged building (Al-Hawari)

Project value: 1,250,000 million two hundred and fifty thousand dinars for the benefit of: Benghazi Municipality Implementation period: 3 months from (08/01/2021) until (11/01/2021) Executive status: Completed according to the schedule.

N

Design and implementation of a metal sandwich structure project for offices and workshops for (Kharif Oil Services Company)

Design and implementation of steel structures, sandwich panel walls and ceilings, offices and workshops for the Khareef Company site. The project consists of a two-story office building with a total area of 160 square meters, a maintenance hall with a total area of 140 square meters, and workshop barriers.